Specialist contractor introductions
PASSIVE FIRELeads
Explore Passive Fire Leads

For commercial & multi-residential property teams

Compartmentation surveys

Arrange surveys to establish the scope of compartmentation issues.

When this work is needed

The property team needs a clearer understanding of fire-resisting divisions or has findings that require further investigation. A useful survey starts with agreed objectives and access limitations.

Typical projects

  • Preparing a remedial programme after identified defects
  • Investigating selected areas in an occupied building
  • Coordinating surveys across multiple sites

What contractors need

  • The purpose of the survey and the questions you need the report to address.
  • Building use, approximate size, number of buildings/floors and the areas of concern.
  • Available plans, previous findings and known inaccessible or concealed areas.
  • Occupation, access permissions, intrusive-work constraints and responsibility for opening up and making good.

Unknown quantities and budgets can be clarified later. Tell us what is confirmed and what still needs investigation.

Who this service is for

Building owners, managing agents, housing providers and estates teams who need clearer evidence about compartmentation before defining remedial work or commissioning further investigations.

Documents you can send

  • Previous compartmentation findings or relevant FRA extracts in PDF
  • Available PDF floor plans or compartmentation drawings
  • JPEG/PNG photographs and location references for known concerns

Up to 3 PDF, JPG/JPEG or PNG files, each up to 10 MB (10,000,000 bytes). Export spreadsheets or drawings to PDF. Remove unnecessary resident details and share only documents you are authorised to provide.

After you submit your report

We clarify the survey objective, coverage and access constraints before considering a specialist introduction. The surveyor agrees the methodology and limitations with you. Findings can then support a separate review of remedial packages.

Availability is checked for each project. If a suitable introduction is not available, we will explain that.

  1. 01

    Review your enquiry

    We organise the enquiry and clarify missing procurement information.

  2. 02

    Consider an introduction

    Scope, coverage and evidence are reviewed, with contractor interest and your agreement recorded.

  3. 03

    Agree the work directly

    You discuss assessment, quotation, programme and appointment directly with the contractor.

A defined scope

Relevant work packages

One enquiry can cover several requirements. Keep the scope, price and responsibility for each package clear.

Before appointing a specialist

Define what the survey is intended to establish, which areas are included, available drawings and any intrusive access constraints. The surveyor should explain the method, sampling, limitations, reporting and responsibility for making good.

PFL arranges introductions. Technical assessment, design, delivery and certification remain with the appropriate professionals; an introduction does not certify the building.

Practical questions

Before you send your enquiry

Do I need complete compartmentation drawings before enquiring?

No. Share the plans and records you have, including their source and date. Explain what is missing so the surveyor can propose an appropriate starting scope.

Does a survey inspect every concealed area?

Only the agreed scope can establish what will be inspected. Ask the surveyor to explain sampling, intrusive access, inaccessible areas and reporting limitations before appointment.

Does the survey include repairs?

Not unless separately agreed with the contractor. Keep investigation, report production, drawing work and subsequent remedials clear in the appointment.

A report, a question or an outline scope.

You can start with any of these. Choose the route that suits your project.