When this work is needed
An investigation or project design has identified external or cavity barrier requirements. The scope may involve concealed construction, access constraints and interfaces with facade or roofing systems.
Typical projects
- Work arising from documented cavity investigations
- Barrier requirements within an approved refurbishment scope
- Further investigation needed to establish a remedial package
What needs to be established
Share the investigation findings and available construction details. The specialist must establish the system, substrate, cavity and interface requirements with the relevant design team. Existing reports and photographs do not replace project-specific assessment.
A useful starting brief
Survey findings, facade or cavity drawings, available product records and access constraints.
Add the town, UK nation, building use, procurement stage and intended timescale. Unknown quantities and budgets can be clarified later.